ODPermitFree calculator

ODPERMIT / STATE FIELD GUIDE CT

ConnecticutOversize & overweight permits.

For a Connecticut move, check loaded height, the single-trip permit window and the route survey or larger-load review your dimensions may trigger.

Source-linked state referenceContent reference View dated sources
01

Legal size & loaded measurements

Loaded dimensions

Published Connecticut baselines are 8 feet 6 inches width and 13 feet 6 inches height; length and weight require configuration-specific analysis.

Axles, weight & bridges

Use complete axle, spacing, wheelbase, tire, configuration, registration, route and gross-weight facts; GVW alone is not a Connecticut decision.

Loaded width

Connecticut's published legal width baseline is 8 feet 6 inches.

Loaded height

Connecticut's published legal height baseline is 13 feet 6 inches.

02

Permits, routes & larger loads

Roads & authorities

A CTDOT permit is limited to the designated route and agency jurisdiction; local, toll, private and facility permissions remain separate.

When a permit is needed

Nonconforming vehicles or loads require the applicable Connecticut OS/OW permit; a single-trip permit is ordinarily three days and one designated trip.

Larger-load review

Loads over 150 feet, 16 feet wide, 16 feet high or 200,000 pounds enter CTDOT's superload process; route survey and additional coordination are required.

03

State permit fees

Single-trip agency fee example

$42 for this Connecticut planning example: a nondivisible load measuring 8′7″ wide, 13′ high and 70′ overall, at 72,000 lb gross on a five-axle rig with a 48′ trailer. The example uses 100 in-state miles. Change the load details in the calculator for your move.

What the agency estimate includes

The calculator applies Connecticut's maintained single-trip permit schedule to the loaded vehicle and the supplied fee inputs. It itemizes the supported state charges, including weight or distance charges where applicable. Annual permits, special products, local permissions and payment-method charges need their own applicable schedule.

CT / Permit worksheet

Price your Connecticut movement.

Enter the complete loaded vehicle. Get estimated agency fees and escort requirements before sharing your contact details.

Crossing state lines? Use the route calculator
Single-trip · nondivisible loadOther permits & charges
Start with an example

Example loaded measurements are filled in. Adjust the equipment, mileage and registration to match your movement.

01

Loaded dimensions

Measure ground to highest point, widest point, and the full tractor–trailer–load length. These are not cargo-only dimensions.

Width
Height
Overall length
02

Equipment & registration

Trailer length
Trailer + load length
Axle weights, overhangs & movement details Optional
Front overhang
Enter 0 when there is no overhang.
Rear overhang
Enter 0 when there is no overhang.

Actual axle groups

Some weight fees depend on axle loads and spacing. Enter measured groups in travel order; do not divide gross weight evenly.

No ODPermit fee or markup. No contact details required.

Your estimate

The numbers behind your next move.

Your result will show the agency fee breakdown, potential pilot-car requirements, and the rules used to calculate them.

  1. 01 State agency fee subtotal
  2. 02 Escort & survey considerations
  3. 03 Sources & pricing assumptions

Single-state pricing uses the mileage you enter. For a proposed route and intermediate states, use the route calculator.

Agency fees only. Annual permits, specialized products and conditional services have separate terms.See the fee reference
About the example equipment

The samples use ODPermit’s editable 48 ft flatbed · 5 axles planning profile. Loaded dimensions, gross weight, 100 state miles and Texas registration are example inputs, not a capacity rating or a route approval. Replace them with your actual setup.

Great Dane Freedom trailer specifications48 ft platform; the illustrated 40 in drop deck and 20 in drop support a 60 in upper-deck planning height. Combined tare and tractor geometry are editable ODPermit assumptions.

04

Pilot cars, height poles & surveys

14′6″-wide load example

Example: 14′6″ wide × 13′ high, 75′ overall, 72,000 lb gross, zero overhang or rear projection, ordinary nondivisible freight in daylight. Depending on the road or permit conditions: CTDOT decides whether police assistance is needed for the route and traffic conditions. An approved police substitution can fill a civilian position; do not book it as an automatic extra vehicle. Depending on the road or permit conditions: A projection over 25 ft measured from its last visible support requires a pilot car. This differs from overhang beyond the vehicle. Turning into an opposing lane or needing ramp assistance can also require a pilot. All road types: 1 front and 1 rear pilot cars.

17′6″-high load example

Example: 9′ wide × 17′6″ high, 75′ overall, 72,000 lb gross, zero overhang or rear projection, ordinary nondivisible freight in daylight. The current CTDOT table assigns a front and a rear police escort for these dimensions. Police may fill a civilian position only when CTDOT explicitly allows the substitution on the permit. At 14 ft 6 in or higher, the front escort needs a height pole. It is included in the civilian plan above. Depending on the road or permit conditions: On undivided highways, a load wider than its travel lane needs a pilot car even below the statewide width threshold. The permitted route determines placement. Depending on the road or permit conditions: A projection over 25 ft measured from its last visible support requires a pilot car. This differs from overhang beyond the vehicle. Turning into an opposing lane or needing ramp assistance can also require a pilot. A Connecticut-based surveyor must complete the certified route survey within one week of the move. CTDOT assigns the final crew and permissions; these dimensions are outside ordinary movement limits. Superload moves use an approved nighttime schedule. All road types: 1 front (height pole required) pilot car.

05

Travel hours & road restrictions

Travel hours

Ordinary permitted movement is daylight-only, one-half hour after sunrise to one-half hour before sunset, with no Saturday, Sunday or holiday movement unless specially authorized.

Current route restrictions

The issued permit and CTDOT route conditions can narrow the ordinary window; check current construction, weather, visibility and holiday controls.

06

Signs, flags & safety equipment

Safety equipment

Apply current CTDOT signs, flags, amber lighting, escort-vehicle and securement requirements; the permit and route conditions control.

07

What the driver needs

Carry the permit

Keep the issued permit with the operator and follow every route, date, time and condition printed on it.

Prepare the driver packet

The driver packet must match the issued vehicle/load, route, dates and conditions and include the required safety and securement records.

08

Special equipment & permit programs

Special permit programs

Divisible-load, annual indivisible, milk, radioactive, industrial and manufactured-goods paths have separate current conditions and must not be inferred from a generic single-trip rule.

BEFORE THE TRUCK ROLLS

Turn the estimate
into a permitted move.

Confirm the loaded measurements, carrier details, travel dates and exact pickup and delivery. We can help coordinate permits, escorts and route surveys around those facts.

Get permit assistance

THE SOURCE RECORD

Official references.

Read the rule behind each requirement. These are dated references; current restrictions and the issued permit control your move.

  1. 01
    Oversize/Overweight Frequently Asked Questions

    Do I need an Oversize / Overweight Vehicle permit?

    Source record:
  2. 02
    Oversize/Overweight Frequently Asked Questions

    Do I need an Oversize / Overweight Vehicle permit?

    Source record:
  3. 03
  4. 04
  5. 05
    Oversize/Overweight Frequently Asked Questions

    What is a Superload move?

    Source record:
  6. 06
    Oversize/Overweight Frequently Asked Questions

    What is the procedure for Superload?

    Source record:
  7. 07
    Connecticut DOT oversize/overweight single trip

    Connecticut DOT oversize/overweight single trip

    Source record:
  8. 08
    CTDOT — current manufactured goods and equipment escort table

    CTDOT — current manufactured goods and equipment escort table

    Source record:
  9. 09
    Connecticut General Statutes 14-270(b) — undivided-highway escort

    Connecticut General Statutes 14-270(b) — undivided-highway escort

    Source record:
  10. 10
    Connecticut RCSA 14-270-21 — projections and escort operations

    Connecticut RCSA 14-270-21 — projections and escort operations

    Source record:
  11. 11
    CTDOT — current manufactured goods and equipment escort table

    CTDOT — current manufactured goods and equipment escort table

    Source record:
  12. 12
    Connecticut General Statutes 14-270(b) — undivided-highway escort

    Connecticut General Statutes 14-270(b) — undivided-highway escort

    Source record:
  13. 13
    Connecticut RCSA 14-270-21 — projections and escort operations

    Connecticut RCSA 14-270-21 — projections and escort operations

    Source record:
  14. 14
  15. 15
    Oversize/Overweight Frequently Asked Questions

    Do I need Pilot/Escort vehicles

    Source record:
  16. 16
How ODPermit uses official sources

ACROSS THE STATE LINE

Keep the whole trip in view.

All 48 state guides